Maintaining and improving our wastewater treatment systems is an ongoing effort that requires many capital construction projects. These projects take place at the Budd Inlet Treatment Plant, offsite facilities, pump stations and LOTT’s sewer interceptor pipelines. LOTT has multiple capital projects underway at any one time. Check back occasionally for updates on ongoing and upcoming projects.

Construction Crane at the Budd Inlet Treatment Plant, Olympia WA

LOTT Construction Impacts

Some construction projects may cause disruptions beyond LOTT property boundaries. When construction is likely to cause disruptions, LOTT strives to alert residents and business owners who may be affected.

Capitol Lake Pump Station

This project replaces the coatings in the Capitol Lake Pump Station wet wells. The linings have begun to fail, creating the risk of wet well deterioration and pump blockages. Coating the wet wells protects the concrete from hydrogen sulfide, which can degrade the concrete. The new wet well coatings will increase the lifespan of concrete in the wet wells and reduce the risk of system failure during high flow situations. Capitol Lake Pump Station Project News (PDF)

Capitol Lake Pump Station

This project replaces the coatings in the Capitol Lake Pump Station wet wells. The linings have begun to fail, creating the risk of wet well deterioration and pump blockages. Coating the wet wells protects the concrete from hydrogen sulfide, which can degrade the concrete. The new wet well coatings will increase the lifespan of concrete in the wet wells and reduce the risk of system failure during high flow situations. Capitol Lake Pump Station Project News (PDF)

North Pipeline Upgrades

This project replaces the original 30-inch north pipeline located at the Cascade Pole site, which was lined in 1992 when the rest of the pipeline was replaced with 48-inch pipe. This will increase the flow capacity and eliminate the risk of an aging asset. This pipeline is the major pipe connecting the treatment plant to our marine outfall in Budd Inlet. Engineering design will be completed in 2027, with construction scheduled for 2030.