Skip to content

Topics: Reclaimed Water Infiltration Study

Description of work associated with the implementation phase of the study.
Work plan for the tracer testing and water quality monitoring.
Work plan for hydrogeologic modeling to predict residual chemical concentrations.
Work plan for the ecological risk assessment.
Work plan for the human health risk assessment.
Response to Peer Review comments for the study design and draft scope of work.
Peer Review evaluation of the study design and draft Phase 3 scope of work.
Response to Peer Review comments for the Hydrogeologic Characterization Report and the Tracer Testing and Water Quality Monitoring Work Plans.
Peer Review evaluation of the Hydrogeologic Characterization Report and Tracer Test and Water Quality Monitoring work plans.
Response to Peer Review comments for the Water Quality Monitoring Report and screening-level risk evaluations.
Loading

Looking for something else?